[1] |
郭彦林, 崔晓强. 大跨度复杂钢结构施工过程中的若干技术问题及探讨[J]. 工业建筑, 2004,34(12): 1-5, 22.(GUO Yan-lin, CUI Xiao-qiang. Key technical problems and discussion in construction process of larger span steel structures[J]. Industrial Construciton,2004,34(12): 1-5, 22.(in Chinese))
|
[2] |
伍小平, 高振锋, 李子旭. 国家大剧院钢壳体施工全过程模拟分析[J]. 建筑结构学报, 2005,26(5): 40-45.(WU Xiao-ping, GAO Zhen-feng, LI Zi-xu. The analysis of whole erection process for steel shell of National Grand Theatre[J]. Journal of Building Structure,2005,26(5): 40-45.(in Chinese))
|
[3] |
郭彦林, 郭宇飞, 高巍, 刘学武,李久林. 国家体育场钢结构屋盖落架过程模拟分析[J]. 施工技术, 2006,35(12): 36-40, 73.(GUO Yan-lin, GUO Yu-fei, GAO Wei, LIU Xue-wu, LI Jiu-lin. Simulating analysis of removing temporary supports for steel structural roof in National Stadium[J].Construction Technology,2006,35(12): 36-40, 73.(in Chinese))
|
[4] |
范重, 刘先明, 胡天兵, 范学伟, 赵莉华. 国家体育场钢结构施工过程模拟分析[J]. 建筑结构学报, 2007,28(2):134-143.(FAN Zhong, LIU Xian-ming, HU Tian-bing, FAN Xue-wei, ZHAO Li-hua. Simulation analysis on steel structure erection procedure of the National Stadium[J]. Journal of Building Structures,2007,28 (2): 134-143. (in Chinese))
|
[5] |
陈国栋, 郭彦林, 叶浩文, 顾国荣, 李鸿生. 广州市新体育馆屋盖吊装及拆撑过程动态分析[J]. 建筑结构, 2002,32(1): 5357.(CHEN Guo-dong, GUO Yan-lin, YE Hao-wen, GU Guo-rong, LI Hong-sheng. Tracing analysis of truss roof structure for Guangzhou gymnasium from hoisting state into designing state[J].Building Structure,2002,32(1): 53-57.(in Chinese))
|
[6] |
叶芳芳, 余志武, 袁俊杰. 重庆大剧院大悬挑结构卸载分析[J]. 建筑科学与工程学报, 2009,26(3): 123-126.(YE Fang-fang, YU Zhi-wu, YUAN Jun-jie. Unloading analysis for large cantilever structure of Chongqing Grand Theatre[J]. Journal of Architecture and Civil Engineering,2009,26(3): 123-126.(in Chinese))
|
[7] |
范重, 刘先明, 范学伟, 李丽, 彭翼. 大跨度空间结构卸载过程仿真计算方法[J]. 建筑科学与工程学报, 2011,28(4): 19-25.(FAN Zhong, LIU Xian-ming, FAN Xue-wei, LI Li, PENG Yi. Simulation and calculation method of unloading process of largespan spatial structures[J].Journal of Architecture and Civil Engineering,2011,28(4): 19-25.(in Chinese))
|
[8] |
郭彦林, 郭宇飞, 刘学武. 大跨度钢结构屋盖落架分析方法[J]. 建筑科学与工程学报,建筑钢结构进展, 2007,24(1): 5258.(GUO Yan-lin, GUO Yu-fei, LIU Xue-wu. Analysis methods of removing temporary supports to largespan steel structural roof[J]. Journal of Architecture and Civil Engineering,2007,24(1): 52-58.(in Chinese))
|
[9] |
刘学武, 郭彦林, 郭宇飞. 千斤顶单元法在大跨度钢屋盖拆撑过程数值模拟中的应用[J]. 施工技术, 2010,39(8): 2428, 33.(LIU Xue-wu, GUO Yan-lin, GUO Yu-fei. Application of jack element model for numerical simulation of removing temporary supports of large-span steel roof[J]. Construction Technology,2010,39(8): 24-28, 33.(in Chinese))
|
[10] |
郭彦林, 刘学武. 大跨度钢结构屋盖拆撑过程数值模拟的千斤顶-间隙单元法[J]. 西安建筑科技大学学报(自然科学版), 2008,40(1): 1-7.(GUO Yan-lin, LIU Xue-wu. Jack-gap element model for numerical simulation of removing temporary supports of largespan steel structural roof[J]. Journal of Xi’an University of Architecture & Technology(Natural Science Edition),2008,40 (1): 1-7.(in Chinese))
|