LIU Shuhong, WANG Zihao, ZHEN Weigang. Complex Variable Function Solutions for Stress and Displacement Distributions in Surrounding Rock of Deep Buried Highway Tunnels[J]. Applied Mathematics and Mechanics, 2018, 39(5): 548-557. doi: 10.21656/1000-0887.380137
Citation: LIU Shuhong, WANG Zihao, ZHEN Weigang. Complex Variable Function Solutions for Stress and Displacement Distributions in Surrounding Rock of Deep Buried Highway Tunnels[J]. Applied Mathematics and Mechanics, 2018, 39(5): 548-557. doi: 10.21656/1000-0887.380137

Complex Variable Function Solutions for Stress and Displacement Distributions in Surrounding Rock of Deep Buried Highway Tunnels

doi: 10.21656/1000-0887.380137
  • Received Date: 2017-05-13
  • Rev Recd Date: 2017-05-31
  • Publish Date: 2018-05-15
  • In order to optimize the design of highway tunnels and ensure the safety of construction, mechanical behavior of rock shall be made clear during highway tunnel excavation. With the complex variable method, firstly, the exterior domain of the tunnel was transformed into a unit-circle domain through the conformal mapping function; then 2 stress functions were derived with the Cauchy integral formula and the residue theorem; thereby, closed-form plane strain solutions of the surrounding rock were obtained for stresses and displacements. The curved-wall horseshoe-shaped cross section was adopted, and the distributions of stresses and excavation displacements along the tunnel boundary and the coordinate axes were calculated respectively with mathematical software MATLAB. To verify the accuracy of the stress and displacement distributions derived with analytical solutions, a 2D plane strain model was established with finite element software ANSYS. Comparison between the numerical results and the approximate analytical results shows good agreement. The results show that, the maximum hoop stress occurs at the arch foot, the maximum horizontal displacement occurs at the hance, the largest settlement and uplift are at the centers of the vault and the invert, respectively. Normal stresses along coordinate axes change obviously near the tunnel, and the maximum stress doesn’t always occur at the tunnel boundary. The maximum stress approaches the applied load at a distance less than 10 m from the tunnel boundary. The largest displacement occurs at the tunnel boundary, and gradually reaches zero with an increasing distance from the tunnel boundary.
  • loading
  • [1]
    许翥中. 弹性力学中的复变函数方法[M]. 北京: 高等教育出版社, 1989.(XU Zhuzhong. The Method of Complex Function in Elasticity Mechanics [M]. Bejing: Higher Education Press, 1989.(in Chinese))
    [2]
    МУСХЕЛИШВИЛИ Н И. 数学弹性力学的几个基本问题[M]. 赵惠元, 译. 北京: 科学出版社, 1958.(МУСХЕЛИШВИЛИ Н И. Some Basic Problems in Mathematical Elasticity [M]. ZHAO Huiyuan, transl. Beijing: Science Press, 1958.(Chinese version))
    [3]
    徐芝纶. 弹性力学[M]. 5版. 北京: 高等教育出版社, 2016.(XU Zhilun. Elasticity [M]. 5th ed. Beijing: Higher Education Press, 2016.(in Chinese))
    [4]
    LIU Shuhong, DUAN Shijie. Analytical solutions of cracks emanating from an elliptic hole in an infinite plate under tension[J]. Chinese Journal of Mechanical Engineering,2014,27(5): 1057-1063.
    [5]
    段士杰, 刘淑红. 剪切荷载作用下圆孔孔边裂纹的解[J]. 应用数学和力学, 2016,37(7): 740-747.(DUAN Shijie, LIU Shuhong. Solutions for a circular hole with edge cracks under shear load[J]. Applied Mathematics and Mechanics,2016,37(7): 740-747.(in Chinese))
    [6]
    祝江鸿. 隧洞围岩应力复变函数分析法中的解析函数求解[J]. 应用数学和力学, 2013,34(4): 345-354.(ZHU Jianghong. Analytic functions in stress analysis of the surrounding rock for caverns with the complex variable theory[J].Applied Mathematics and Mechanics,2013,34(4): 345-354.(in Chinese))
    [7]
    ZHAO Guangpu, YANG Shengli. Analytical solutions for rock stress around square tunnels using complex variable theory[J]. International Journal of Rock Mechanics and Mining Sciences,2015,80: 302-307.
    [8]
    唐治, 潘一山, 朱小景, 等. 直墙拱形巷道围岩应力场分析[J]. 土木建筑与环境工程, 2015,37(3): 79-85.(TANG Zhi, PAN Yishan, ZHU Xiaojing, et al. Analysis of surrounding rock stress field of vertical wall archy roadway[J]. Journal of Civil, Architectural & Environmental,2015,37(3): 79-85.(in Chinese))
    [9]
    EXADAKTYLOS G E, STAVROPOULOU M C. A closed-form elastic solution for stresses and displacements around tunnels[J]. International Journal of Rock Mechanics and Mining Sciences,2002,39(7): 905-916.
    [10]
    苏锋, 陈福全, 施有志. 深埋双隧洞开挖的解析延拓法求解[J]. 岩石力学与工程学报, 2012,31(2): 365-374.(SU Feng, CHENG Fuquan, SHI Youzhi. Analytic continuation solution of deep twin-tunnels[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(2): 365-374.(in Chinese))
    [11]
    李培楠, 刘俊, 苏锋, 等. 任意形状隧道围岩应力与位移的解析延拓求解[J]. 同济大学学报(自然科学版), 2013,41(10): 1483-1489.(LI Peinan, LIU Jun, SU Feng, et al. Analytical continuation method for solving stress and displacement of surrounding rock buried tunnel excavation with arbitrary shape section[J]. Journal of Tongji University ( Natural Science ), 2013,41(10): 1483-1489.(in Chinese))
    [12]
    施有志, 高轩能. 深埋马蹄形隧道开挖围岩应力与位移的复变函数解[J]. 土木建筑与环境工程, 2014,36(1): 101-105, 118.(SHI Youzhi, GAO Xuanneng. Complex variable function solution of stress and displacement of surrounding rock buried deep horseshoe-shaped tunnel excavation[J]. Journal of Civil, Architectural & Environmental,2014,36(1): 101-105, 118.(in Chinese))
    [13]
    GUAN Zhenchang, DENG Tao, HUANG Hongwei, et al. Back analysis technique for mountain tunneling based on the complex variable solution[J]. International Journal of Rock Mechanics and Mining Sciences,2013,59: 15-21.
    [14]
    邓涛, 魏雯, 关振长, 等. 公路隧道开挖问题的复变函数解及应用[J]. 中国公路学报, 2015,28(10): 90-97.(DENG Tao, WEI Wen, GUAN Zhenchang, et al. Complex variable function solution and its application for road tunnel excavation[J]. China Journal of Highway and Transport,2015,28(10): 90-97.(in Chinese))
    [15]
    LU Aizhong, ZHANG Ning, KUANG Lin. Analytic solutions of stress and displacement for a non-circular tunnel at great depth including support delay[J]. International Journal of Rock Mechanics and Mining Sciences,2014,70: 69-81.
    [16]
    LU Aizhong, ZHANG Ning, QIN Yuan. Analytical solutions for the stress of a lined non-circular tunnel under full-slip contact conditions[J]. International Journal of Rock Mechanics and Mining Sciences,2015,79: 183-192.
    [17]
    ZHANG Zhizen, SUN Yuzhou. Analytical solution for a deep tunnel with arbitrary cross section in a transversely isotropic rock mass[J]. International Journal of Rock Mechanics and Mining Sciences,2011,48(8): 1359-1363.
    [18]
    宋浩然, 张顶立, 房倩. 浅埋海底隧道的围岩应力解析解[J]. 土木工程学报, 2015,48(S1): 283-288.(SONG Haoran, ZHANG Dingli, FANG Qian. Analytic solution on the stress of surrounding rocks for shallow subsea tunnel[J]. China Civil Engineering Journal,2015,48(S1): 283-288.(in Chinese))
    [19]
    王华宁, 骆莉莎, 蒋明镜. 流变岩体中任意形状隧道分部开挖响应的理论解[J]. 岩土工程学报, 2017,39(2): 259-268.(WANG Huaning, LUO Lisha, JIANG Mingjing. Analytical solutions for tunnels with any shape excavated sequentially in rheological rock at great depth[J]. Chinese Journal of Geotechnical Engineering,2017,39(2): 259-268.(in Chinese))
    [20]
    吕爱钟, 张路青. 地下隧洞力学分析的复变函数方法[M]. 北京: 科学出版社, 2007.(L Aizhong, ZHANG Luqing. Complex Variable Function Method in Underground Tunnel Mechanics Analysis [M]. Beijing: Science Press, 2007.(in Chinese))
    [21]
    吕爱钟, 王全为. 应用最优化技术求解任意截面形状巷道映射函数的新方法[J]. 岩石力学与工程学报, 1995,14(3): 269-274.(L Aizhong, WANG Quanwei. New method of determination for the mapping function of tunnel with arbitrary boundary using optimization techniques[J]. Chinese Journal of Rock Mechanics and Engineering,1995,14(3): 269-274.(in Chinese))
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (1297) PDF downloads(521) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return