GUO Xiao-nong, QIU Li-qiu, LUO Yong-feng, YE Zhi-wu, LUO Li-sheng. Constraint Equation Method for Analysis of Removing Temporary Supports From LargeSpan Steel Roof[J]. Applied Mathematics and Mechanics, 2013, 34(9): 986-994. doi: 10.3879/j.issn.1000-0887.2013.09.012
Citation: GUO Xiao-nong, QIU Li-qiu, LUO Yong-feng, YE Zhi-wu, LUO Li-sheng. Constraint Equation Method for Analysis of Removing Temporary Supports From LargeSpan Steel Roof[J]. Applied Mathematics and Mechanics, 2013, 34(9): 986-994. doi: 10.3879/j.issn.1000-0887.2013.09.012

Constraint Equation Method for Analysis of Removing Temporary Supports From LargeSpan Steel Roof

doi: 10.3879/j.issn.1000-0887.2013.09.012
Funds:  The National Natural Science Foundation of China(51078289)
  • Received Date: 2012-08-28
  • Rev Recd Date: 2013-06-25
  • Publish Date: 2013-09-15
  • Four calculation methods for numerical simulation analysis of removing temporary supports from large-span steel roof were introduced——support displacement method, equivalent rod bottom-end displacement method, jack element method and jack-gap element method. Then a new method, constraint equation method, was proposed. All the methods mentioned above were used separately to analyze the process of removing temporary supports from a three-point-support beam which was fixed at both ends. The comparisons of results obtained by these methods indicate that the proposed constraint equation method is rational and effective for accurate simulation analysis of removing temporary supports to steel structural roof.
  • loading
  • [1]
    郭彦林, 崔晓强. 大跨度复杂钢结构施工过程中的若干技术问题及探讨[J]. 工业建筑, 2004,34(12): 1-5, 22.(GUO Yan-lin, CUI Xiao-qiang. Key technical problems and discussion in construction process of larger span steel structures[J]. Industrial Construciton,2004,34(12): 1-5, 22.(in Chinese))
    [2]
    伍小平, 高振锋, 李子旭. 国家大剧院钢壳体施工全过程模拟分析[J]. 建筑结构学报, 2005,26(5): 40-45.(WU Xiao-ping, GAO Zhen-feng, LI Zi-xu. The analysis of whole erection process for steel shell of National Grand Theatre[J]. Journal of Building Structure,2005,26(5): 40-45.(in Chinese))
    [3]
    郭彦林, 郭宇飞, 高巍, 刘学武,李久林. 国家体育场钢结构屋盖落架过程模拟分析[J]. 施工技术, 2006,35(12): 36-40, 73.(GUO Yan-lin, GUO Yu-fei, GAO Wei, LIU Xue-wu, LI Jiu-lin. Simulating analysis of removing temporary supports for steel structural roof in National Stadium[J].Construction Technology,2006,35(12): 36-40, 73.(in Chinese))
    [4]
    范重, 刘先明, 胡天兵, 范学伟, 赵莉华. 国家体育场钢结构施工过程模拟分析[J]. 建筑结构学报, 2007,28(2):134-143.(FAN Zhong, LIU Xian-ming, HU Tian-bing, FAN Xue-wei, ZHAO Li-hua. Simulation analysis on steel structure erection procedure of the National Stadium[J]. Journal of Building Structures,2007,28 (2): 134-143. (in Chinese))
    [5]
    陈国栋, 郭彦林, 叶浩文, 顾国荣, 李鸿生. 广州市新体育馆屋盖吊装及拆撑过程动态分析[J]. 建筑结构, 2002,32(1): 5357.(CHEN Guo-dong, GUO Yan-lin, YE Hao-wen, GU Guo-rong, LI Hong-sheng. Tracing analysis of truss roof structure for Guangzhou gymnasium from hoisting state into designing state[J].Building Structure,2002,32(1): 53-57.(in Chinese))
    [6]
    叶芳芳, 余志武, 袁俊杰. 重庆大剧院大悬挑结构卸载分析[J]. 建筑科学与工程学报, 2009,26(3): 123-126.(YE Fang-fang, YU Zhi-wu, YUAN Jun-jie. Unloading analysis for large cantilever structure of Chongqing Grand Theatre[J]. Journal of Architecture and Civil Engineering,2009,26(3): 123-126.(in Chinese))
    [7]
    范重, 刘先明, 范学伟, 李丽, 彭翼. 大跨度空间结构卸载过程仿真计算方法[J]. 建筑科学与工程学报, 2011,28(4): 19-25.(FAN Zhong, LIU Xian-ming, FAN Xue-wei, LI Li, PENG Yi. Simulation and calculation method of unloading process of largespan spatial structures[J].Journal of Architecture and Civil Engineering,2011,28(4): 19-25.(in Chinese))
    [8]
    郭彦林, 郭宇飞, 刘学武. 大跨度钢结构屋盖落架分析方法[J]. 建筑科学与工程学报,建筑钢结构进展, 2007,24(1): 5258.(GUO Yan-lin, GUO Yu-fei, LIU Xue-wu. Analysis methods of removing temporary supports to largespan steel structural roof[J]. Journal of Architecture and Civil Engineering,2007,24(1): 52-58.(in Chinese))
    [9]
    刘学武, 郭彦林, 郭宇飞. 千斤顶单元法在大跨度钢屋盖拆撑过程数值模拟中的应用[J]. 施工技术, 2010,39(8): 2428, 33.(LIU Xue-wu, GUO Yan-lin, GUO Yu-fei. Application of jack element model for numerical simulation of removing temporary supports of large-span steel roof[J]. Construction Technology,2010,39(8): 24-28, 33.(in Chinese))
    [10]
    郭彦林, 刘学武. 大跨度钢结构屋盖拆撑过程数值模拟的千斤顶-间隙单元法[J]. 西安建筑科技大学学报(自然科学版), 2008,40(1): 1-7.(GUO Yan-lin, LIU Xue-wu. Jack-gap element model for numerical simulation of removing temporary supports of largespan steel structural roof[J]. Journal of Xi’an University of Architecture & Technology(Natural Science Edition),2008,40 (1): 1-7.(in Chinese))
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (1444) PDF downloads(930) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return