|
张锋, 郭鹏飞, 毛保红, 等. 高速铁路临时限速列控设置时机确定及相关安全措施[J]. 铁路技术创新, 2024(6): 79-85.(Zhang Feng, Guo Pengfei, Mao Baohong, et al. Determination of timing for temporary speed restriction for train control on high speed railways and relevant safety measures[J].Railway Technical Innovation,2024(6): 79-85. (in Chinese))
|
|
[2]高永红, 段亚鹏, 郭彦朋, 等. 关于国家高速铁路网战争安全的思考[J]. 防护工程, 2024,46(6): 74-78.(Gao Yonghong, Duan Yapeng, Guo Yanpeng, et al. Reflections on wartime security of the national high-speed railway network[J].Protective Engineering,2024,46(6): 74-78. (in Chinese))
|
|
[3]程伟, 杨新华. 铁路运营安全评估体系构架研究[J]. 铁道技术标准(中英文), 2024,6(9): 30-35.(Cheng Wei, Yang Xinhua. Research on the architecture of railway operation safety assessment system[J].Railway Technical Standard (Chinese & English), 2024,6(9): 30-35. (in Chinese))
|
|
[4]王明年, 郭晓晗, 于丽, 等. 高速铁路隧道紧急救援站人员安全疏散可靠性研究[J]. 铁道标准设计, 2026,70(2): 114-121.(Wang Mingnian, Guo Xiaohan, Yu Li, et al. Reliability study of safe evacuation of personnel at emergency rescue stations in high-speed railway tunnels[J].Railway Standard Design,2026,70(2): 114-121. (in Chinese))
|
|
[5]魏好. 高速铁路气动效应对轨旁监测设备安全的影响研究[J]. 铁道勘察, 2024,50(5): 131-136.(Wei Hao. Research on aerodynamic effect on trackside monitoring equipment safety for high-speed railway[J].Railway Investigation and Surveying,2024,50(5): 131-136. (in Chinese))
|
|
[6]邹俊, 林维, 聂军. 高速铁路联调联试运输组织日计划编制要点及建议[J]. 铁路技术创新, 2024(5): 29-35.(Zou Jun, Lin Wei, Nie Jun. Key points and suggestions for preparation of daily transport organization plan of high speed railway integrated commissioning & test[J].Railway Technical Innovation,2024(5): 29-35. (in Chinese))
|
|
[7]赵娜, 韦晓广, 高仕斌. 基于可靠性和维修成本的高铁接触网维修策略优化[J]. 电气化铁道, 2024,35(6): 1-6.(Zhao Na, Wei Xiaoguang, Gao Shibin. Optimization of maintenance strategy of OCS of high-speed railway based on reliability and maintenance costs[J].Electric Railway,2024,35(6): 1-6. (in Chinese))
|
|
[8]王明涛. 山区大坡道对高铁接触网动静态特性的影响及优化研究[J]. 电气化铁道, 2024,35(3): 41-47.(Wang Mingtao. Impacts to dynamic and static characteristics of OCS of high-speed railway caused by steep grade in mountain area[J].Electric Railway,2024,35(3): 41-47. (in Chinese))
|
|
[9]Wu X, Yuan P, Peng Q, et al. Detection of bird nests in overhead catenary system images for high-speed rail[J].Pattern Recognition,2016,51: 242-254.
|
|
[10]樊少杰, 何龙. 雅万高铁简统化接触网系统应用实践[J]. 中国铁路, 2023(12): 91-97.(Fan Shaojie, He Long. Practices in the application of simplified and unified OCS in jakarta-bandung HSR[J].China Railway,2023(12): 91-97. (in Chinese))
|
|
[11]郑磊. 接触网定位器出现脱落的原因分析及解决措施研究[J]. 机械管理开发, 2023,38(10): 220-222.(Zheng Lei. Analysis of the causes of contact network positioner falling off and solution measures[J].Mechanical Management and Development,2023,38(10): 220-222. (in Chinese))
|
|
[12]Yang Z, Yan C, Wang J, et al. Investigation of failure analysis and failure delay strategy for H13 steel contact wire clip die[J].Engineering Failure Analysis,2025,169: 109138.
|
|
[13]王艺丹. 定位线夹结构与优缺点分析及选型[J]. 电气化铁道, 2023,34(3): 64-66.(Wang Yidan. Analysis of structures and advantages & disadvantages of contact wirer clip and type selection[J].Electric Railway,2023,34(3): 64-66. (in Chinese))
|
|
[14]屈志坚, 张博语, 杨行, 等. 基于MFDC-SSD网络的接触网定位线夹缺陷识别[J]. 铁道学报, 2024,46(5): 48-57.(Qu Zhijian, Zhang Boyu, Yang Hang, et al. Fault identification of overhead contact system steady ears based on MFDC-SSD network[J].Journal of the China Railway Society,2024,46(5): 48-57. (in Chinese))
|
|
[15]王腾, 吴胜强, 杜清全, 等. 高速铁路接触网定位器脱落原因分析及解决措施[J]. 电气化铁道, 2022,33(2): 30-32.(Wang Teng, Wu Shengqiang, Du Qingquan, et al. Analysis of causes of falling off of steady arm of OCS of high-speed railway and its counter-measures[J].Electric Railway,2022,33(2): 30-32. (in Chinese))
|
|
[16]张春春, 王嵩, 张冬凯, 等. 基于图像处理的接触网定位线夹目标检测[J]. 铁道科学与工程学报, 2015,12(6): 1478-1484.(Zhang Chunchun, Wang Song, Zhang Dongkai, et al. Detection of catenary steady clamp based on image processing[J].Journal of Railway Science and Engineering,2015,12(6): 1478-1484. (in Chinese))
|
|
[17]Toubal L, Karama M, Lorrain B. Stress concentration in a circular hole in composite plate[J].Composite Structures,2005,68(1): 31-36.
|
|
[18]Potvin A B, Kuang J G, Leick R D, et al. Stress concentration in tubular joints[J].Society of Petroleum Engineers Journal,1977,17(4): 287-299.
|
|
[19]Kamal M, Rahman M M. Advances in fatigue life modeling: a review[J].Renewable and Sustainable Energy Reviews,2018,82: 940-949.
|
|
[20]Talreja R. Fatigue of composite materials: damage mechanisms and fatigue-life diagrams[J].Proceedings of the Royal Society of London A: Mathematical and Physical Sciences,1981,378(1775): 461-475.
|
|
[21]Lei L, Li B, Wang H, et al. High-temperature high-cycle fatigue performance and machine learning-based fatigue life prediction of additively manufactured Hastelloy X[J].International Journal of Fatigue,2024,178: 108012.
|
|
[22]Jiang L, Hu Y, Liu Y, et al. Physics-informed machine learning for low-cycle fatigue life prediction of 316 stainless steels[J].International Journal of Fatigue,2024,182: 108187.
|
|
[23]刘金增, 张静, 储文平, 等. 高速铁路接触网关键零部件力学特性分析[J]. 电气化铁道, 2019,30(3): 38-42.(Liu Jinzeng, Zhang Jing, Chu Wenping, et al. Analysis of mechanical property of key OCS fittings for high speed railway[J].Electric Railway,2019,30(3): 38-42. (in Chinese))
|
|
[24]李韬, 赵军涛, 杨甲申. 接触网定位线夹强度模拟分析[J]. 电气化铁道, 2019,30(3): 61-63.(Li Tao, Zhao Juntao, Yang Jiashen. Strength simulation and analysis for OCS steady clamps[J].Electric Railway,2019,30(3): 61-63. (in Chinese))
|
|
[25]殷荣幸, 王旭, 李东升. 铁路电气化用铜合金定位线夹失效分析[J]. 热加工工艺, 2015,44(5): 245-246.(Yin Rongxing, Wang Xu, Li Dongsheng. Failure analysis on copper alloy positioning clamp for railway electrification[J].Hot Working Technology,2015,44(5): 245-246. (in Chinese))
|
|
[26]孙增田, 陈永瑞, 赵金凤, 等. 浅谈铜合金定位线夹断裂原因及改进措施[J]. 电气化铁道, 2020,31(3): 52-54.(Sun Zengtian, Chen Yongrui, Zhao Jinfeng, et al. Discussion on causes of fracture of copper alloy steady clamps and related improving measures[J].Electric Railway,2020,31(3): 52-54. (in Chinese))
|