[1] |
万力. 我国起重机科技进步情况的回顾[J]. 起重运输机械, 1999(10): 6-9. (WAN Li. Review of the development of crane technology in our country[J].Hoisting and Conveying Machinery,1999(10): 6-9.(in Chinese))
|
[2] |
须雷. 现代起重机的特征和发展趋向[J]. 起重运输机械, 1997(10): 3-7. (XU Lei. The characteristic features and development trends of modern cranes[J].Hoisting and Conveying Machinery,1997(10): 3-7. (in Chinese))
|
[3] |
顾翠云, 高秀芬, 刘焕江, 武建平. 核电站环行起重机安全保护功能分析[J]. 机械工程与自动化, 2009(6): 93-94, 99. (GU Cui-yun, GAO Xiu-fen, LIU Huan-jiang, WU Jian-ping. Safety and protection function analysis of polar crane in nuclear power station[J].Mechanical Engineering & Automation,2009(6): 93-94, 99. (in Chinese))
|
[4] |
卜广强. 核电站起重机面临的问题及其对策[J]. 起重运输机械, 2010(4): 5-10. (BU Guang-qiang. Issues confronted with cranes for nuclear power plants and its related countermeasures[J].Hoisting and Conveying Machinery,2010(4): 5-10. (in Chinese))
|
[5] |
Kim Y S, Hong K S, Sul S K. Anti-sway control of container cranes: inclinometer, observer, and state feedback[J].International Journal of Control, Automation, and Systems,2004,2(4): 435-449.
|
[6] |
Park H, Chwa D, Hong K S. A feedback linearization control of container cranes: varying rope length[J].International Journal of Control, Automation, and Systems,2007,5(4): 379-387.
|
[7] |
WU Jia-jang. Dynamic responses of a three-dimensional framework due to a moving carriage hoisting a swinging object[J].International Journal for Numerical Methods in Engineering,2004,59(13): 1679-1702.
|
[8] |
Park K P, Cha J H, Lee K Y. Dynamic factor analysis considering elastic boom effects in heavy lifting operations[J].Ocean Engineering,2011,38(10): 1100-1113.
|
[9] |
Aufaure M. A finite element of cable passing through a pulley[J]. Computers & Structures,1993,46(5): 807-812.
|
[10] |
Ju F, Choo Y S. Super element approach to cable passing through multiple pulleys[J].International Journal of Solids and Structures,2005,42(11/12): 3533-3547.
|
[11] |
Hong D W, Cipra R J. A method for representing the configuration and analyzing the motion of complex cable-pulley systems[J].Journal of Mechanical Design,2003,125(2): 332-341.
|
[12] |
李宁, 陈其华, 陈元野, 常国富. 大起升高度门座起重机起升钢丝绳扭转打结分析和处理[J]. 起重运输机械, 2011(4): 53-56.(LI Ning, CHEN Qi-hua, CHEN Yuan-ye, CHANG Guo-fu. Analysis of twisting causes of wire rope of portal crane with high lifting height[J].Hoisting and Conveying Machinery,2011(4): 53-56.(in Chinese))
|
[13] |
霍志刚. 起重机吊钩组稳定性的评估[J]. 建筑机械化, 2002(2): 34-35.(HUO Zhi-gang. The stability evaluation of the lifting hook group[J].Construction Mechanization,2002(2): 34-35.(in Chinese))
|
[14] |
齐朝晖. 多体系统动力学[M]. 北京: 科学出版社, 2008: 145-148.(QI Zhao-hui.Dynamics of Multibody Systems [M]. Beijing: Science Press, 2008: 145-148.(in Chinese))
|
[15] |
张青, 张瑞军. 工程起重机结构与设计[M]. 北京: 化学工业出版社, 2008: 37-46.(ZHANG Qing, ZHANG Rui-jun.Structure and Design of Engineering Crane [M]. Beijing: Chemical Industry Press, 2008: 37-46.(in Chinese))
|